IndiaMinistry of Jal Shakti

Special Scheme for Inter-Linking of Rivers

The National Perspective Plan (NPP) was prepared by the then Ministry of Irrigation (now Ministry of Jal Shakti) in August 1980 for water resources development through inter basin transfer of water, for transferring water from water surplus basins to water-deficit basins. Under the NPP, the National Water Development Agency (NWDA) has identified 30 links (16 under Peninsular Component & 14 under Himalayan Component) for preparation of Feasibility Reports (FRs). The details of above river linking projects viz., rivers, States concerned is given at Annexure.

Under the Peninsular Component of NPP, the following 14 links are envisaged in the Southern part of India:

  1. Mahanadi (Manibhadra) -Godavari (Dowlaiswaram) link
  2. Godavari (Inchampalli) – Krishna (Pulichintala) link
  3. Godavari (Inchampalli) – Krishna (Nagarjunasagar) link
  4. Godavari (Polavaram) – Krishna (Vijayawada) link
  5. Krishna (Almatti) – Pennar link
  6. Krishna (Srisailam) – Pennar link
  7. Krishna (Nagarjunasagar) – Pennar (Somasila ) link
  8. Pennar (Somasila) – Cauvery (Grand Anicut) link
  9. Cauvery (Kattalai) – Vaigai -Gundar link
  10. Par-Tapi-Narmada link
  11. Damanganga – Pinjal link
  12. Bedti – Varda link
  13. Netravati – Hemavati link
  14. Pamba – Achankovil – Vaippar link

Out of the above 14 links, the following 8 link projects involve Narmada, Godavari and Krishna rivers.

  1. Mahanadi (Manibhadra) – Godavari (Dowlaiswaram) link
  2. Godavari (Polavaram)–Krishna (Vijayawada) (Implemented by Govt. of AP)
  3. Godavari (Inchampalli) –Krishna (Pulichintala) link
  4. Godavari (Inchampalli)– Krishna (Nagarjunasagar) link
  5. Krishna (Nagarjunasagar)–Pennar (Somasila) link
  6. Krishna (Srisailam) – Pennar link
  7. Krishna (Almatti) – Pennar link
  8. Par-Tapi –Narmada link project

The Pre-Feasibility Reports (PFRs) and FRs of the links under SI no. 1 to 8 above including the Detailed Project Report (DPR) of Par-Tapi-Narmada link project were already completed and circulated to party States. Pending consensus on Manibhadra and Inchampalli dams due to large submergence, alternate study to divert unutilized waters of Indravati sub-basin of Godavari basin have been carried out and the DPR viz. Godavari (Inchampalli barrage)-Cauvery (Grand Anicut) link project has also been completed and circulated to party States. The details of rivers to be linked are already included in Annexure. The Special committee for Interlinking of Rivers (ILR), after considering the views of all the stakeholders, is proceeding ahead to expedite the objectives of the interlinking of rivers in a consultative and cooperative manner. The implementation of the ILR projects involves various steps such as perpetration of PFRs/FRs of links, negotiation and consensus among concerned States, preparation of DPRs of the projects, clearance from appraisal agencies which includes clearance by Ministry of Environment & Forests and Climate Change and Ministry of Tribal Affairs, techno-economic clearance by Advisory Committee on Irrigation, Flood control &Multipurpose Projects of Ministry of Jal Shakti, investment clearance and the construction time required for the completion of the projects as per the DPR.

Thus, the implementation of the projects will take varying periods of time. An ILR project would reach the implementation stage when all the statutory clearances are taken and an agreement is reached amongst party states from the implementation of the project.

This Information was given by the Minister of State for Jal Shakti & Tribal Affairs, ShriBishweswarTudu  inRajyaSabha today.

AnnexurE 

Annexure referred to in reply to part (a) & (b) of Unstarred Question No. 73 to be answered in Rajya Sabha on 19.07.2021 regarding “SPECIAL SCHEME FOR INTER-LINKING OF RIVERS”. 

Names of Inter Basin Water Transfer Links, the States involved, name of rivers and status of Feasibility Reports/Detailed Project Report

 

S. No Name Rivers States concerned Present Status
Peninsular  Component      
1 Mahanadi (Manibhadra) -Godavari (Dowlaiswaram) link Mahanadi  & Godavari Odisha, Maharashtra,  AP, MP, Telangana, Jharkhand, Karnataka, Chhattisgarh FR Completed*
2 Godavari (Inchampalli) – Krishna (Pulichintala) link Godavari  &   Krishna Odisha, Maharashtra,  AP, MP, Telangana, Karnataka, Chhattisgarh FR Completed
3 Godavari (Inchampalli) – Krishna (Nagarjunasagar) link Godavari & Krishna -do- FR Completed #

DPR Completed

4 Godavari (Polavaram) – Krishna (Vijayawada) link Godavari & Krishna -do- FR Completed
5 Krishna (Almatti) – Pennar link Krishna  &Pennar Maharashtra,  Andhra Pradesh, Karnataka &Telangana FR Completed
6 Krishna (Srisailam) – Pennar link Krishna  &Pennar -do- FR Completed
7 Krishna (Nagarjunasagar) – Pennar (Somasila ) link Krishna  &Pennar -do- FR Completed #

DPR Completed

8 Pennar (Somasila) – Cauvery (Grand Anicut) link Pennar& Cauvery Andhra Pradesh, Karnataka, Tamil Nadu, Kerala & Puducherry FR Completed #

DPR Completed

9  Cauvery (Kattalai) – Vaigai -Gundar link Cauvery,Vaigai&Gundar Karnataka, Tamil Nadu, Kerala & Puducherry DPR Completed
10 Ken-Betwa link Ken &Betwa Uttar Pradesh  & Madhya Pradesh DPR (Phase-I,II & Comprehensive report) Completed
11 (i) Parbati -Kalisindh-  Chambal link Parbati, Kalisindh& Chambal Madhya Pradesh, Rajasthan & Uttar Pradesh (UP  requested to be consulted during consensus building) FR Completed
(ii) Parbati-Kuno-Sindh link Parbati, Kuno and Sindh MP and Rajasthan PFR completed$
12 Par-Tapi-Narmada link Par, Tapi& Narmada  Maharashtra & Gujarat DPR Completed
13 Damanganga – Pinjal link Damanganga&Pinjal Maharashtra & Gujarat DPR Completed
14 Bedti – Varda link Bedti&Varda Maharashtra,  Andhra Pradesh & Karnataka PFR Completed

 

15 Netravati – Hemavati link Netravati&

Hemavati

Karnataka, Tamil Nadu &  Kerala PFR Completed
16 Pamba – Achankovil – Vaippar link Pamba, Achankovil&

Vaippar

Kerala & Tamil Nadu, FR Completed
FR of alternate Mahanadi (Barmul) – Rushikulya – Godavari (Dowlaiswaram) link project completed

# Pending consensus on Manibhadra and Inchampalli dams, alternate study to divert unutilised waters of Godavari river carried out and DPR of Godavari (Inchampalli) – Pennar (Somasila)- Cauvery (Grand Anicut) link project completed.

$ Integration of Eastern Rajasthan Canal Project of Rajasthan and Parbati- Kalisindh-Chambal link.

Himalayan Component
1. Manas-Sankosh-Tista-Ganga (M-S-T-G) link Manas, Sankosh, Tista and Ganga Assam, West Bengal,  Bihar& Bhutan FR completed
2. Kosi-Ghaghra link Kosi&Ghaghra Bihar , Uttar Pradesh & Nepal PFR completed
3. Gandak-Ganga link Gandak& Ganga -do- FR  completed

(Indian portion)

4. Ghaghra-Yamuna link Ghaghra& Yamuna -do- FR completed (Indian portion)
5. Sarda-Yamuna link Sarda& Yamuna Bihar, Uttar Pradesh, Haryana, Rajasthan, Uttarakhand& Nepal FR completed (Indian portion)
6. Yamuna-Rajasthan link Yamuna &Sukri Uttar Pradesh, Gujarat, Haryana & Rajasthan Draft FR  completed
7. Rajasthan-Sabarmati link Sabarmati -do- FR  completed
8. Chunar-Sone Barrage link Ganga &Sone Bihar & Uttar Pradesh Draft FR  completed
9. Sone Dam – Southern Tributaries of Ganga link Sone&Badua Bihar & Jharkhand PFR completed
10. Ganga(Farakka)-Damodar-Subernarekha link Ganga, Damodar&Subernarekha West Bengal, Odisha& Jharkhand FR completed
11. Subernarekha-Mahanadi link Subernarekha& Mahanadi West Bengal  &Odisha FR completed
12. Kosi-Mechi link Kosi&Mechi Bihar , West Bengal & Nepal PFR completed
13. Ganga (Farakka)-Sunderbans link Ganga &Ichhamati West Bengal FR  completed
14. Jogighopa-Tista-Farakka link

(Alternative to M-S-T-G)

Manas, Tista& Ganga -do- Dropped

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Comment moderation is enabled. Your comment may take some time to appear.

Back to top button