Video

PM Modi inaugurates various railway projects in West Bengal

Subscribe Now: https://goo.gl/8qsb5E Stay Updated! ????

Follow us to stay updated:

► Download the NM App: http://nm4.in/dnldapp
► Like us on Facebook: https://facebook.com/narendramodi
► Follow us on Twitter: https://twitter.com/narendramodi
► Follow us on Instagram: http://instagram.com/narendramodi

Prime Minister will inaugurate the extension of Metro Railway from Noapara to Dakshineswar, and flag off the first service on this stretch. This 4.1 km extension has been constructed at a cost of Rs. 464 crore, fully funded by the Central Government. It will decongest road traffic and improve urban mobility. This extension will ease out access to the two world famous Kali Temples at Kalighat and Dakshineswar, for lakhs of tourists and devotees. The two newly built stations namely Baranagar and Dakshineswar have modern passenger amenities and are also aesthetically designed and decorated with murals, photographs, sculptures and idols.

Prime Minister will also inaugurate the third line between Kalaikunda and Jhargram over a stretch of 30 km of the 132 km long Kharagpur-Adityapur Third Line Project of South Eastern Railway, which was sanctioned with an estimated cost of Rs. 1312 crores. The four stations between Kalaikunda and Jhargram have been redeveloped by constructing four new station buildings, six new foot over bridges and eleven new platforms, along with renovation of the existing infrastructure. It will help ensure seamless movement of passenger and freight trains on Howrah-Mumbai Trunk route.

Prime Minister will dedicate to the nation the doubling of Azimganj to Khargraghat Road section, which is a part of Howrah – Bandel – Azimganj section of Eastern Railway, which has been laid at a project cost of about Rs 240 crore.

Prime Minister will also dedicate to the nation the fourth line between Dankuni and Baruipara (11.28 kms) of Howrah – Bardhaman Chord Line and the third line between Rasulpur and Magra (42.42 kms) of Howrah – Bardhaman Main Line, which serves as principal gateway of Kolkata. The third line between Rasulpur and Magra has been laid at a cost of Rs. 759 crores, while the fourth line between Dankuni and Baruipara has been laid at a project cost of Rs. 195 crores.

These projects will ensure better operational fluidity, less journey time and enhanced safety of train operations, as well as boost the overall economic growth of the region.

Related Articles

Back to top button